Tuesday, May 15, 2012

Flush!

Last week we spent in the trenches. Matthew & Geoff Barton were here installing over 400 feet of sewer lines to tie the ANBC office, and the two large cabins into the existing sewer system. This upgrade has been a part of the overall water system project. The last touches to the project will be to repair the roads and driveways and lawns that have suffered the long arm of the excavator as a result of the installation. That will signify the completion of the project. We will then look to installing fixtures in the buildings at a later time.

We are so very grateful to NCEM and the Minute Man Program and those who contribute to it for helping to make this a reality for Arrowhead.
 